• Phone: +31317843939
  • info@floodbased.org

Prefeasibility Study For Construction of Dispersal Structures on Zohb River - Flood-Based Livelihoods Network

June 24, 2021
  • Version
  • Download 7
  • File Size 12.40 MB
  • File Count 1
  • Create Date 24 June 2021
  • Last Updated 24 June 2021

Prefeasibility Study For Construction of Dispersal Structures on Zohb River

Title: Prefeasibility Study For Construction of Dispersal Structures on Zohb River
Author: Cameos Consultants
Year: 2012
Description: A report about the prefeasibility level study for the construction of 6 dispersal structures across Zhob River at different feasible locations and the assess the availability of water at the proposed structure sites through comprehensive water balance studies.

Attached Files

FileAction
52 Prefeasibility-Study-For-Construction-of-Disoersal-Structures-on-Zohb-River-District-Zohb-Balochistan_SF.pdfDownload